PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued erecting Derrcik -1 Facing South-East (800x600).jpg Derrick -1 Facing South (800x600).jpg Rebar mats at Elev. 7-Stair -4,5 Facing East(800x600).jpg Erecting Derrcik -1 Facing South-West (800x600).jpg Installed sheer wall panels at Elev. 7-Stair -4,5 Facing East  (800x600).jpg
Previous page Installed sheer wall panels at Elev. 7-Stair -4,5 Facing East  (800x600)
Installed sheer wall panels at Elev. 7-Stair -4,5 Facing East (800x600)